Traffic

Click to Interact
Type
Location
Description
Time
incident
I-75Northbound
Road blocked due to crash on I-75 Northbound from Exit 212 Bill Gardner Pkwy to Exit 216 GA-155.
construction
Marietta Stboth ways
Road closed due to construction work on Marietta St both ways between Centennial Olympic Park Dr and Andrew Young International Blvd. Detour in operation - Traveling westbound on Marietta St NW Turn right onto Ted Turner Dr NW Turn left onto Baker St NW Continue west on Baker St NW towards Marietta St NW to regain normal traffic flow Traveling eastbound on Marietta St NW Turn left onto Baker St NW Turn right onto Centennial Olympic Park Dr NW Continue south on Centennial Olympic Park Dr NW towards Marietta St NW toregain traffic flow.
construction
GA-42Northbound
Road closed due to construction work on GA-42 Druid Hills Rd Northbound between Druid Hills Dr and GA-13 Buford Hwy. Detour in operation - I-85 northbound to Exit 91, SR 155/Clairmont Road, and then turn onto SR 13/Buford Highway.
construction
GA-400 SSouthbound
Exit ramp from GA-400 Southbound to Glenridge Conn Ne Northbound closed due to construction work. Detour in operation.
construction
Dan Stribling Rdboth ways
Road closed due to construction work on Dan Stribling Rd both ways from GA-74 to Huel Brown Rd.
construction
I-85 Exit 79Northbound
Exit ramp from I-85 Exit 79 Northbound to 20th Ave Southbound closed due to construction work. Detour in operation - Exit 77/Fob James Dr. or Georgia Exit 2 / GA-18..
construction
I-85Westbound
Entry ramp to I-85 Westbound at Exit 79 from S Broad Ave Southbound closed due to construction work. Detour in operation - Georgia Exit I-85 Exit 2 / GA-18..
construction
Pine Hill Drboth ways
Closed to high sided vehicles due to new road layout on Pine Hill Dr both ways from Cherokee St to Duncan Dr.
construction
Baxter Stboth ways
Single alternate line traffic due to sewer works on Baxter St both ways from Collins Ave to Baxter Dr.
construction
Bankstone Drboth ways
Road closed due to construction on Bankstone Dr both ways from Clintwood Dr to GA-360 Macland Rd.
construction
County Line Rdboth ways
Closed to high sided vehicles on County Line Rd both ways from Riley Rd to Yates Dr.
construction
GA-77-SPURboth ways
Road closed due to construction work on GA-77-SPUR Cokesbury Hwy both ways from Coldwater Creek Rd to Flat Rock Rd.
construction
Weldon Rdboth ways
Road closed due to construction work on Weldon Rd both ways from US-29 to Industrial Rd.
construction
US-27-ALTboth ways
Road closed due to construction work on US-27-ALT Roosevelt Hwy both ways from GA-173 Raleigh Rd to Holy Hill Pl.
construction
Jenkinsburg Rdboth ways
No through traffic for trucks over eight tons on Jenkinsburg Rd both ways from Jackson Rd to Towaliga River.
construction
Indian Creek Rdboth ways
No through traffic for trucks over eight tons on Indian Creek Rd both ways from Dean Patrick Rd to Towaliga River.
construction
James Rdboth ways
No through traffic for trucks over 18 tons on James Rd both ways between US-29 Lawrenceville Hwy and Cruse Rd.
construction
Elm Stboth ways
Road closed due to construction on Elm St both ways from Barham St to Derrick St.
construction
Paces Ferry Rdboth ways
No through traffic for trucks over 18 tons on Paces Ferry Rd both ways between Moores Mill Rd and Ridgewood Rd. Temporary length limit of 30'.
construction
Brookstone Walkboth ways
Closed to high sided vehicles on Brookstone Walk both ways from Burnt Hickory Rd to Kenbrook Dr.
On AirPower 100.1 - Athens #1 Hit Music Station Logo

mobile apps

Everything you love about powerathens.com and more! Tap on any of the buttons below to download our app.

amazon alexa

Enable our Skill today to listen live at home on your Alexa Devices!